On shift KEG, SP, GZ, FM, SB, PR, ER Due to a Tevatron access the stacking was stopped around 20:00 with 14mA in the machine. Until the stacking was resumed we decided to turn on the gas jet and write some data with the e+e- trigger to test the filter. We noticed that the e+e- trigger rate was too high (about 39 KHz). PBG3 rate was only 5 KHz. We removed the non-CCAL arm of the trigger (C_MLU2) to get a more reasonable rate (about 1.1 KHz). - File /dump1/run0469.dat was an attempt to run both the CCAL and Psinc filter analyses. Psinc decoding complained a lot. Without the Psinc analysis there were still some problems with bad FERAs. - File /dump1/run0473.dat has only the CCAL analysis in the filter. At 2:15 we turn off the HV and the gas jet and we informed the MCR that we finished our studies. At 3:00 there was still no beam due to a booster power supply problem.