On Shift: DB, GS, MA, GZ, RC Data taking at the chi2 peak. The beam was decelarated around 1:40 pm. Beam Momentum : 5726.114 MeV/c C.M. Energy : 3556.588 MeV Beam Current : 28 mA After the pedestal run (run 692) the DAQ hangs due to a PCOS Controller problem. GZ and RC investigate and fix the problem by sending a CLEAR to the PCOS controller. Data taking starts at 6:10 am. Instanteneous luminosity roughly 1.6x10**31. Runs 693 and 694 both end due to a DAQ problem (DYC 12).