Shift Report ============ 8:00am - 4:00pm, Oct. 25, 1996 On Shift: XF,WB,SJ,GZ,KG Goal of this shift: taking data at chi2 peak The main DAQ hanged for RUN 693, 694, 695, it was fixed by GZ about 10:00am, the buffer of gateway was too small. About 9:00am TP found the 3.5 degree movable detector had been moved, XF and TP moved it back to the right place after RUN 695. 10:00am, the tapes on drv5 and drv6 (CHARM), drv9 and drv10 (CALIB) could not be mounted, these four drvs were taken out of main DAQ by GZ. Luminosity: RUN 694: 39.9 nb^-1 (DAQ hanged) RUN 695: 37.7 nb^-1 (DAQ hanged) RUN 696: 159.4 nb^-1 RUN 697: 63.2 nb^-1 (DAQ abort, too many errors) RUN 696 is the first good runs since we started to take data at chi2 peak. Luminosity PC-Based DAQ, Files saved : lm0695.dat lm0696.dat lm0697.dat Make sure you have saved the PC luminosity data file and start the PC luminosity DAQ at the same time when the main DAQ starts a new run. Xiaoling