On Shift: RC, MT, SA Data taking at the chi2 peak. Initial Beam Current: 22.3 mA Initial Jet Density: 1.17*10^14 cm-3 Initial Luminosity: 1.5*10^31 cm-2 sec-1 The H1 n.8 was not seen in the hit map. We fix the problem removing the cables for the silicon strobe card (which were not used). These cables also reverse the polarity at the input of the TDC's modules. Fera module changed on CCAL, vsn 73 , crate 3. After this, pedestal run (run 699). End of shift during run 702. Integrated luminosity: Run 698 134 nb-1 Run 701 156 nb-1