Shift summary Nov 20th 16:00-24:00 On Shift: CP (shift captain) MA Beam current was 45.8 mA at the beginning of the shift, it is now 42 mA Took data at Ecm=3644 (etac' background) Run: Ldt (nb^-1) 802 173 (continuing from previous shift) 803 168 805 170 806 82 by now, continuing into the next shift Since the beginning of the stack (from 13:00 to 24:00) we took 770 nb^-1 Quite impressive in 11 hours!!! DA run smoothly all the time. The only major problem was the failure of the internal power supply of fn835z (see Keith's mail). We could not look at the monitor for ~3 hours. The camac program has been fixed by George: it can now handle the extra PCOS (from run 805) The cable for the CRNK TDC was connected upside down in the strobe card (channel 16-> 1 instead of 1-> 16). It has been fixed by Enrico at the beginning of run 806 The luminosity program gave an error while writing data for the run LM-0805.dat. Same error also during run 806. Todd came in to restart the program Just at the end the luminosity control hang. Restarted by Gabriele Claudia and Marta