On shift: XF and MA RUN 820 (from last shift) ended normally at 17:15pm. RUN 821 Started at 17:18pm, stopped at 20:00pm for deceleration to J/psi. DAQ ran smoothly, we even did not need to "reset" the DAQ. RUN 820: 190.3 nb^-1 RUN 821: 153.7 nb^-1 The total integrated luminosity at Ecm=3625MeV is ~1.6 pb-1 20:00pm, stop run 821 for the deceleration to J/psi. Straw HV off, Power VLPC off, Mainframe HV off, Gas Jet off. 23:20pm, Steve Werkema called from MCR, they were close to be ready. 23:47pm, Steve Werkema called again, they were ready, Ecm = 3097.437 MeV, Pbeam = 4067.565 MeV/c, Beam current=13.7mA. Gas-Jet on. Pedestal run is under way. The instantaneous luminosity in the scaler window was 10 times smaller than its virtual value, it should be in the unit of 10^31 instead of 10^30, it has been fixed by Jon Streets. XF and MA