Shift summary 23-11 from 0-8 am. On shift Mara Martini, Sheng Jin, and all the night the precious collaboration of Keith. Beam momentum 4067.567 MeV/c Ecm 3097.565 MeV/c. We started to take data at the beginning of the shift after a series of DAQ resets. The thresholds of the NUT (NeUtral Trigger) were changed by Sheng, and we prescaled by a factor of 10 the phi-phi trigger as well as the Etot (software prescale). We were running at 2.8x10^30cm-2s-1 during Run 823. The tagger program showed a small number of events with respect the one expected, ie a cross section of 2nb instead of 18nb (from E760). At 3:30 we call Paul who decelerated to Ecm = 3096.821 MeV/cm. A little bit below the peak... The cross section is around 11nb. Run 824 has 29nb-1. We stopped because the acquisition hung. Now (8:15) we are running since 11 minutes without problem (Run 828). We have called George. Detector performances: several plots are glued on the logbook. Cheers Mara