On Shift: Bettoni, Pastrone The beam instability problem was not solved until 19:30, when MCR called to say that the beam energy was stable at Ecm = 3685.55. At that point, since we were 450 keV below the psi prime peak, we decided to go down to Ecm = 3635 MeV (etac prime search). We started data taking at 20:40 with run 846, which stopped after 35 minutes due to an I/O error on tape drive drv11. We then started run 847, which finished just before the end of the shift. We have run in constant luminosity mode (2.4 * 10**31 cm-2 sec-1). Summary of data taken: run 846 39 nb-1 run 847 201 nb-1 Diego and Nadia