On shift: XF and NP RUN 862, Ecm = 3615 MeV, 193 /nb. Run 863, missing. RUN 864, Ecm = 3604 MeV, 159 /nb. RUN 865 (under way). Total integrated luminosity at Ecm = 3615 MeV is 1.59 /pb (855-862). The beam current is now 21.6 mA. ACNET page W77 was OFF and it was restarted once. 18:44, stop RUN 862 to decelerate the beam to 5910 MeV/c. No beam losses during deceleration. Jet target regulation, to keep instantaneous luminosity about 2.1 10**31 cm-2 s-1, done by hand (it's important to check straws HV and VLPCs biases during this operation). NP and XF