On Shift: XF and GG Continue to take data at Ecm = 3620 MeV for etac prime. Smooth shift. Totally we have 1088 /nb at this energy point so far. RUN Luminosity 902 145.6 /nb (inherited from last shift) 903 146.4 /nb 904 150.4 /nb 905 under way Beam current dropped from 18mA to 14mA, gas density was changed several times to keep the luminosity between 1.8-2.0E31. By looking at online monitor, we saw that straw HV tripped at 6:20am and tripped again at 6:40am (RUN 904), reset straw HV twice. Argon Mix for the straws: the bottles probably should be swapped in the early afternoon of today. Instructions are on the gas check list (12/7, 4:50am). Cheers. XF and GG