Day Shift Summary for December 7, 1996 Gollwitzer, Lasio Inherited run 905 144 nb^-1 run 906 144 nb^-1 end of eta_c' running 11.9mA reamins. Total 1476 nb^-1 for data at 3620MeV Another Tape Drive has failed. This time it eats the tapes. See the damaged tape cassette in counting room. Keith has changed the configuration such that a different tape drive will be used for the particular stream for J/psi data taking; Keith will have the hardware group replace the two non-functional drives on Monday. There were no DAQ hangs, but there was one ~15 second period when the DAQ livetime decreased due to an increase in trigger rate. At noon, detector off and jet off. Steve Werkema in MCR ready to decelarate. At the end of shift, beam at J/psi peak + 500keV and 10.5mA. Another 0.5 hours to step to J/psi peak. Keith and Giovanni