Owl shift summary for December 8, 1996. G.Zioulas, M.Ambrogianni Inherited run 909 and ended it around 8am. A slow and uneventful shift. We got 210.4 nb^-1 at the J/psi (3096.9 MeV): Run 908: 66.1 nb^-1 Run 909: 144.3 nb^-1 We were left with 3.7 mA in the accumulator. We turned off the gas jet and the high voltages. We called the MCR to try to decelerate the remaining beam to the etac. George and Marta