On shift: WB & GC, Pretty smooth shift the luminosity from the Lum_read_new program was wrong at the beginning of the shift, Keith fixed that. At 14:25 and at 15:20 we noticed a drop (about 20%) in all the rates without any change in the Jet density . Detectors checked, nothing wrong hes been found. MCR called, Martin HU is investigating, the problem is probably due to a vertical shift of the beam. Summary of data taking: Run 5571: 193.5 nb^-1 Ibeam = 53.85 mA at the beginning, 51.84 mA at the end Run 5572: 306.2 nb^-1 Ibeam = 51.84 mA at the begining, 48.67 mA at the end Run 5573: in progress, 212.0 nb^-1 so far, Ibeam = 48.67 mA at the beginning Logbook#7 pages:120-126 Have a good night Gigi & Wander