-End of stacking at 10:07 with 55.38 mA -End of deceleration at 12:30 with 52.7 mA -We have waited till 14:40 before turning the jet on in order to lower the sigmaP that got around 1.2 MeV/c. -After turning on the jet at8e14 at/cc we've lost 0.5mA of beam -Turned the jet off and let the beam cool down for about 40 min. -15:24 After having turned the jet on very slowly, we began run 5708 Cheers Gabriele and Ted