Shift summary for 7/30/00 00:00-8:00 On shift: GL , DC Logbook #8 , page 236 Run summary: 1P1 (3526.2 MeV) Beg. cur.: ~10.5 mA Fin. cur.: 6.9 mA Typical luminosity: 1.86x10^31 cm^-2 s^-1 Typical beam width: 0.9 MeV Run Lum. (nb-1) 7057 345.4 7058 under way Total int. lum. up to run 7057 for this stack: 1520 nb-1 Comments: very smooth and slow shift. Nothing to report, except a couple of DAQ hangs and a JT nozzle unclogging. Detector and beam very well behaved. Have a nice day, Giovanni and Dave