Friday 4 pm. Dave McGinnis tells me that they have identified two leaks, of which at least one is "significant", in the A60 tanks, that they have a good guess at where exactly the leaks are and that they are preparing to do the measurements and - if the leaks turn out to be where expected -implement the fixes by the end of Sunday. If the leaks are in less accessible places, fixing will take longer. We should know where we stand/sit by Saturday afternoon. After the fixes are done and the tanks are back on line, there will be a proper bake which takes (at least) 5 days. There will be stacking studies and work on phasing of the cooling during this time. Stephen