Evening shift 1/31/00 On shift: Giovanni Lasio, Federica Legger Deceleration ended at 16:05 with 19.1 mA at the psi ' peak. Run 5076: Int. lum. -> 37.2 nb-1 , duration-> 3671.4 s Run 5077: Int. lum. -> 144.1 nb-1 , duration-> 13863.5 s Run 5078: in progress Typical instantaneous luminosity: 1.0E31 cm-2 s-1 Typical jet target density: 1.1E14 cm-3 At the end of the shift the beam current is 15.8 mA. At 17:50 Giulio informed us that the beam was completely stabilized. Run 5076 was ended prematurely, since we opted for a new run with a totally stable beam. Very smooth and uneventful shift (the *good* kind of uneventful...). Good night everybody, Giovanni & Federica