Evening Shift Summary 2/3/2000 Beam at start: 16.76 mA; Beam at end: 13.56 mA Data type: chi 2 scan (1th and 2nd point) Run 5104 1st chi2 pt Run 5106 Pedestal run Run 5107 2nd chi2 pt Summary: 18.10 *Run 5104 ended with I_beam= 15.79 mA L_int= 144.3 nb{-1} E_beam = 3558.7 MeV Straws II OFF *Deceleration begun 18.25 Replaced 2 ADC 4300s by 4300Bs in VSN 91 and 92 and checked pedestal values (Run 5105) 19:00 Deceleration ended with 15.56 mA left. The energy is now 3557.2 MeV 19:10 Pedestal run 5106 19:15 Run 5107 started with 15.56 mA All detectors ON. Jet density 1.4 10{14} cm{-3} 22:30 Jet density increased to 1.59 10{14} cm{-3} 24:00 Run 5107 ended with I_beam= 13.56 mA L_int= 200 nb{-1} Good night Margherita and Federica