On shift: Wander Baldini, Mathew Graham Third point of the chi_2 scan, E_cm = 3555.72 MeV . Very smoooth shift, interrupted only by a couple of DAQ hangs, resolved with reset. At midnight run 5107 was stopped, the deceleration finished at 1:10am and run5109 started. I_beam = 13.38 mA at the beginning I_beam = 10.75 mA at the end Run 5109 integrated lum. = 266.8 nb^-1 Mathew & Wander