Shift Summary 2/6/2000 Day: Beam at start: 18.20 mA; Beam at end: 15.91 mA; Typical Lumin. 1.2 x 10^31 cm^-2 s^-1 Data type: chi1,first point (Ecm = 3511.7 Mev) Run 5120 (183 nb-1); Shifters: SP, PR, KEG (4hrs) Log Book 6 Pages 235-239 Summary: Gas Check Done..no bottles changed.. Beam quite nice and stable all shift.. 10:10 am: after deceleration and cooling of the beam, beam current is 18.33 mA and Ecm is 3511.65 Mev; pedestal run 5118 is written to database 10:25 am: STRAW 2 current overload (more than 100 microA), turned off for a while 10:27 am: data taking starts -> run 5119 10:45 : found CCAL shaper boards off, run 5119 aborted 10:52 : run 5120 starts (Ibeam = 18.02 mA) monitor plots look as usual..missing 4 ccal blocks, missing 2 FVC's missing 2 H2p's in ADC plot and 1 in TDC plot. 12:30 pm: STRAW 2 turned on with HV = 1500 V (I = 66 microA) 12:35 : DAQ hang -> reset issued 15:15 : STRAW 2 current has decreased to 55 microA -> HV moved to 1530V (usual value) and currents goes to 66 microA. 15:40 : stopped run 5120 (Ibeam = 15.91 mA), deceleration begins Stephen & Paolo & Keith