Shift Summary 2/6/2000 16:00 - 24:00: Beam at start: 15.51 mA; Beam at end: 13.14 mA; Typical Lumin. 1.1 x 10^31 cm^-2 s^-1 Data type: chi1,second point (Ecm = 3511.3 Mev) chi1,third point started (Ecm = 351... Mev) Shifters: AT, ZM, MO Log Book 6 Pages 239-242 Summary: Gas Check Done: Freon bottle changed. Pedestal run 5121 not written to database. Data taking (run 5122)started at 17:20, after deceleration and cooling of the beam. 21:25 gas jet density icreased from 1.22 10{14} cm{-3} to 1.33 10{14}cm{-3} 22:34 run 5122 stopped when total luminosity for this point reached 198.5 nb-1 deceleration begins 23:30 deceleration finishes. Pedestal run 5123 not written to database. 23:45 Run 5124 started with 13.15 mA Have a good night. Amiran, Zaza and Margherita