On shift: WB,MN,KEG,MO,FL,PR,GG,etc.... Lots of problems during the shift. No data have been taken. 12:00 stop stacking 1:10 ready to decelerate 4:10 deceleration done. 4:30 Problem with the camac due to a bad connection , KEG and PR solved it 4:45 Jet on, rates of the neutral logics higher than normal, still investigating, rates will be higher. 5:25 The horizontal cooling is dead, Steve is investigating. Found a broken power supply. Replaced. 5:57 Jet back on, the set density and the read on are different. Called Gabriele. 7:05 VLPC temperature too high, problems with the contamination of the liquid helium. 7:10 Problem with a CCAL shaper board Michelle is investigating. 7:40 VLPCs OK 7:45 GG warms up the target. 7:55 Pedestal run (run#5234) and finally start taking data (run#5235). Have a good day! WB, MN, KEG, etc...