People on shift : GG MO (+ help from KG WB NP FM ) RUN 5440 ended at 9.59 with a beam current of 20.5 mA (inherited) Integrated Luminosity: 272.37 nb(-1) 5441 Integrated luminosity:254.63 nb(-1) Beam current at the end 18.09 mA 5442 Integrated Luminosity: 98.8 nb(-1) Beam current at the end :17.18 mA 5443 In progress Beam current at the end of the shift : 16.41 mA MAIN ISSUES *straws off until beginning of run 5441 *pbar source has problems with the 4-8 GHz cooling system; still investigating *succesfull run at constant luminosity( about 2 * 10(31) cm(-2)s(-1)) for runs 5440(final part),5441,5442. *One major DAQ hang made us stop run 5442 Logbook 7 Pag 11-15 Gabriele and Margherita