On shift : RC, NP LOGBOOK #7, pag. 25-29 Run at the chi_0 background (3470 MeV) with a constant luminosity of about 2 * 10^31 cm^(-2)s^(-1). Beam stable (initial current 33.3 mA) FEW PROBLEMS: Scaler readout was wrong ( looking at the printout it was wrong since April 5th). A broken NIM-ECL converter was found and changed. Now the scalers are OK. After every automatic stop and start run, errors on some drivers "Failed to clear interval timer" Jet was in regulating mode, but the density did not change. We then switched off the regulating mode and adjusted the density. 7 DAQ hangs, reset works OK for all cases. LUMINOSITY SUMMARY RUN 5455 Integrated Luminosity: 259.1 nb^(-1) (inherited) 5456 Integrated luminosity: 276.0 nb^(-1) 5457 Integrated Luminosity: 280.0 nb^(-1) 5458 Just started Total integrated luminosity for this run 815 nb^(-1) !!! Beam current at the end of the shift : 27.7 mA Roberto and Nadia