Shift Summary 4/16/2000 Owl: Beam at start: 19.8 mA; Beam at end: 12.5 mA ; Typical Lumin. (2.5) x 10^31 Data type: chi0 background (Ecm = 3385 MeV) Runs 5494 (218.03 nb-1) (inherited) 5495 (233.49 nb-1) 5496 (221.61 nb-1) Total: 1304.82 nb-1 5497 in progress Shifters: MO, NP Log Book 7 Pages 64-68 Summary: Data taking at Ecm = 3385 MeV. We ran the gas jet manually erasing the density up to > 4 10^14 at/cm^3. We had to warm up the nozzle few times. Both straw chambers tripped once. Mainframe 2 was not responding during a "check all" towards the end of run 5496: problem solved exiting the HV control program. This problem appeared in the data trasferred. Other than that: some DAQ hangs successfully taken care of with RESET and two acnet alarms (fixed by MCR). Margherita and Nadia