Day Shift 4/16/00 GG/SP (guests KG and WB) Logbook 7, pp 69-70 Chi0 background point (Ecm ~3384.5 MeV) Starting Current 12mA End Current 9.5mA Stack Ended to start stacking. Shift Summary: 4 hrs of smooth data taking with a few resets; luminosities from 2.5 to 2.1 10E31 with gas-jet above 3*10E14. End run at 11:45 am following STOP PROCEDURES procedure in preparation for starting to stack again at noon. (C1 Freon flow set low/straws left as are) 5497 (inherited) 238 nb-1 5498 104 nb-1 Total for stack = 1.65 pb-1