On Shift: WB,GG (+KEG) Stacking ends at 10:00, Ibeam = 56.0 mA Some problems with RF, Cooling/Deceleration ends at 15:00, Ibeam = 48.6 mA At 3:42 there was a 0.1 mA beam loss quite similar to the 10 mA one that happened during last stack. Runs summary: Run 5509: pedestal run, written in the database. Run5510 in progress, 45 nb^-1 so far Logbook pages: 83-85 Logbook#7 ciao Gabriele & Wander