Shift Summary for 5/1/00 8:00-16:00 On Shift: GL, MG Log Book #7 pages 136-140 Run Summary: 5583 chi0 (3406 MeV) beginning current: 31.5 mA final current : 29.5 mA total luminosity : 189.2 nb-1 5584 chi0 (3406 MeV) beginning current: 29.3 mA final current : 26.5 mA total luminosity : 237.4 nb-1 5585 chi0 (3406 MeV) beginning current: 26.4 mA This run is still under way Total luminosity at Ecm = 3406 MeV so far : 1058.0 nb-1 Comments: Lots of DAQ hangs for synchronization number mismatch. In 1 case DYC 7 caused the DAQ to hang without sending errors to MURMUR; run 5583 was stopped and after INIT the problem does not appear again. MCR warns us that there are studies under way using line AP3 and that we might occasionally notice it with the detector. Most likely as a result of this the straws tripped 4 times and at the same time to logging rate to tapes would go down. Other than this, smooth data taking. Giovanni & Matt sult of this the straws tripped 4 times and at the same time to logging rate to tapes would go down. Other than this, smooth data taking. Giovanni & Matt