05/02/00 Day Shift Summary: (Log Book: #7, p.147-148) On shift: MP,MG Data Type: chi0 (Ecm=3406 MeV) Beam current at start: ~12.5 mA . Beam current at end: 10.89 mA . Typical Luminosity: 2 x 10^31 cm^-2s^-1 Run: 5589 (286.3 nb-1) inherited 5590 (92.1 nb-1) End of stack #14--total luminosity at 3406MeV = 2620.9 nb^-1 Comments: Stack was dumped at 11am with about 11 mA remaining. No real problems. Had to unclog the nozzle twice. Straws tripped once and we had one DAQ hang (DYC 7 'data in'). Good Day, ~ Marco,Matt