On shift: MP, EM Logbook n.7, pag. 156-159 Quite a smooth shift, with 5 DAQ hangs ECM 3526.2 - ECM drift <+-100 KeV, quite limited indeed (from P77) Istart = 41 mA Iend=34.3 mA Run 5601 (inherited) 282 nb-1 Run 5602 283 nb-1 Run 5603 286 nb-1 -------- Total so far 1416 nb-1 Run 5604 (current) Note: observed a periodic (1h or so), short term (5'), 20% increase of the data load, at constant trigger rate. Like an increase of the event size for at least one detector. Keep a (watchful) eye on that... Ciao, Marco and Ezio