On Shift: GG, ML, PR Energy: 3526.2 MeV >From 8:00 to 11:00 the beam energy oscillated between 5625.9 and 5626.5 MeV. MCR investigated the problem and changed some parameters of the accumulator. >From 11:00 to now the beam has been stable at the requested energy. As during the previous shift, we observed at 8:20 an increment of the event size which lasted 5 min and it was tracked down to an instability of the VLPC temperature. Wander fixed it when it happened again at 9:30. Summary of data taking: run5604 (inherited): Time_start=6:51 Time_stop=10:00 I_start=35.32mA I_stop=32.37mA Int_lum = 288.5 nb^-1 Ecm (offline) = 3526.15 Mev ; sigma = .46 Mev run5605 : Time_start=10:00 Time_stop=13:35 I_start=32.37mA I_stop=29.18mA Int_lum = 300.0 nb^-1 Ecm (offline) = 3526.05 Mev ; sigma = .43 Mev run5606 (in progress): Time_start=13:35 I_start=29.18mA Logbook pages: 159-167 Logbook#7 Gabriele, Maurizio and Paolo