Running at 3525.7; about 600 nb-1 so far for run 5616, 5617, 5618 (in progress) Paolo helped us taking 15 minutes of random gates data at the beginning (16:46): run5614 and 5615. Then physical run; note that GM6 prescaling factor has been changed from 35 to 20. The only major problem was the temperature of the VLPC (up to 13K) that caused the tripping of the HV twice. Wander and Stephen came in to stabilize the temperature and let us use the fibers. Logbook 7 p 176-182 Cheers Gabriele, Giovanni and Maurizio