On Shift: GC/DB MO KEG,PR,MS,JK,EM,MG Log Book #7 pages 184-190 Run Summary: 5626 1P1 (3525.7 MeV) beginning current: 29.56 mA final current: 26.7 mA total luminosity : 295.3 nb-1 5627 1P1 (3525.7 MeV) beginning current: 26.7 in progress Total integrated luminosity up to run 5626(included) : 1525.2 nb^-1 Comments: We spent first part of our shift to fix the problem reported by JK in the previous shift summary: * one fn835y hard-disk (the same which gave problems on 05/04/00) stopped commnicating. PR and KEG removed this disk from SCGI bus. Files that were written on /raw6 and /raw5 (random gate and ppbar) are now written on /raw9 and /raw4. * FERA channel corrisponding to hot CCAL block (ring 18 wedge 7) had very high pedestal value. Fera were replaced by MS, KEG and PR. Three pedestal runs (5623- 5624-5625) were taken to investigate the problem. Target was off while people worked to fix problems. 11:15 Target MEC was rebboted because it was not sending data to ACNET. We used the target in regulating mode during run 5626 / 5627 Average Instantaneous Luminosity was 2.96 10^31 ( live time: about 93%). Thanks to everybody helping us during this shift. Good night Diego,Gigi,Margherita