On shift: GG & SB Beam at start: 41.3 mA; Beam at end: 36.0 mA ; Typical Lumin: 2.6 x10^31 cm^-2sec^-1 (Not background-subtracted) Data type: 1P1 scan (Ecm = 3525.95 MeV) Runs: 5653 (280.9/nb) (inherited) 5654 (54.9/nb) (stopped to fix DAQ problem) 5671 (306.8/nb) 5672 in progress, 20.1/nb so far Logbook pages: 228-232 logbook#7 Summary: 3 DAQ hangs and straw trips correlated to small (two about 0.01 mA, one about 0.2 mA) beam losses. Unrecoverable DAQ hang causes PR & KEG to be called in. Problem was fixed in about 1 hr. by replacing a faulty 50Ohm terminator (this does not necessarily imply that it was it causing the problem, though.) CO_2 and Freon bottles almost empty, keep an eye. A procedure to obtain an emergency CO_2 bottle is posted in the gas shed (we do not have a spare on hand.) Cheers and such, Gabriele & Stefano is posted in the gas shed (we do not have a spare on hand.) Cheers and such, Gabriele & Stefano