Shift Summary for 5/15/00 0:00-8:00 On Shift: JK,SS Log Book #7 pages 240-243 Run Summary: 1P1 (3525.95 MeV) Beginning Current: 17.8 mA Final Current : 11.5 mA Beam Sigma: < 250 keV Run Luminosity 5682 299 nb-1 5683 194.7 nb-1 5684 205.1 nb-1 Comments: 4 DAQ Hangs. 2 Straw HV trips. 2 Gas Jet Unclogs. Run 5683 aborted itself when drive 8 could not be written too. We don't yet know if it was a problem with the drive or the tape. After the Gas Jet density was maxed out at 3.7E14 and the rates kept dropping, we followed the procedure for increasing the luminosity by lowering the nozzle temperature. The beam was dumped at 8:10. Good Morning, Jason & Seon-Hee