Shift Summary for 5/17/00 8:00-16:00 On Shift: JK, GC Log Book #7 Pages 253-257 Run Summary: 1P1 (3526.8 MeV) Beginning Current : 29.7 mA Final Current : 23.4 mA Typical Luminosity: 2.5 10^31 cm^-2 s^-1 Typical Beam Width: 1.3 MeV Run Luminosity 5698 43.0 nb^-1 5699 221.1 nb^-1 5700 318.6 nb^-1 5701 passed on to evening shift Total Integrated Luminosity up to Run 5701 is 1.71 pb^-1 Comments: One straw HV trip. Many DAQ hangs. Run 5698 aborted after 0.5 hours due to an inability to write to drive 8. This is the third time since Sunday Owl shift this has happened. The tape was ejected manually, and the drive was cleaned. 11:20 The DAQ kept hanging immediately after each reset for about 5 minutes. Run 5699 had to be stopped. Keith came over and observed the rates for several of the gate masters jump up dramatically. Before the problem was found, the rates mysteriously returned to normal and run 5700 was started. 11:30 P79 was not getting gas jet data. The reinitialization procedure was performed. 13:00 Giovanni B., while filling out the gas check list, discovered the steel ball in the S2 flow meter is stuck. People should note the level of the upper ball instead (see note in Gas Checklist folder).