Shift Summary for 5/18/00 0:00-8:00 On Shift: AT, WR Log Book #7 Pages 260-261 Run Summary: 1P1 (3526.8 MeV) Beginning Current : ~16 mA Final Current : 11 mA (dumped) Typical Luminosity: 2.6 10^31 cm^-2 s^-1, decreasing at end of stack Typical Beam Width: 1.2 MeV Run Luminosity 5703 309.1 nb^-1 (inherited) 5704 334.6 nb^-1 5705 95.6 nb^-1 Total Integrated Luminosity of this stack (19): 3051.6 nb^-1 Comments: switched gas jet to manual mode at beginning of shift/end of last shift. typical jet density was about 4.1*10^14; unclogged the gas jet 3 times. gas check: Argon-mix bottle might be empty pretty soon - experts might want to take a look. 8 DAQ hangs, but all recovered after pressing reset At 7:00 MCR called and asked to dump the beam. After speaking with Keith we stopped the run at 7:10, turned of the detectors etc. following the stop procedure. The end of stack script was NOT run. Gabriele and Seon-He were on shift, though there shift report seems to be missing... we were witness... (their shift report will follow :-) - Have a good day and dila mshvidobisa ! Amiran, Willi