On shift : GL, MG Ecm=3525.4 MeV (rather stable throughout the shift, within 60-70 KeV) Logbook 7, pages 274-276 Run 5715 316.2 nb-1 Run 5716 303.5 nb-1 Run 5717 under way Total integrated luminosity so far at 3525.4 MeV: 2835.3 nb-1 Ibeam at 16:00 = 28.03 mA, Ibeam at 00:00 = 21.3 mA Comments: very smooth shift, with a few DAQ hangs; in one occasion there was a flood of MURMUR warning messages coming from DYC 3 that caused the DAQ to hang; RESET would not work. After CAMAC INIT (between runs 5715 and 5716) there were no more error messages. Have a good night, Giovanni and Matt