Shift Summary for 5/31/00 0:00-8:00 On Shift: JK,TV Log Book #8 Pages 24-26 Run Summary: 1P1 Background (3523.3 MeV) Beginning Current : 31.3 mA Final Current : 24.8 mA Typical Luminosity: 1.8x10^31 cm^-2 s^-1 Typical Beam Width: 1.5 MeV/c Total Integrated Luminosity: 364 nb^-1 Run Luminosity 5670 364 nb^-1 5671 Given to Day Shift Comments: 3 DAQ Hangs. 2 ACNET Alarms. 0:30 The beam energy had been drifting downwards since about noon (very slowly). Martin raised it from about 3523.1 MeV back to 3523.3 MeV. Although this is not a very serious issue for this (a background) point, it's best to not let the drift get out of control. 2:18 Freon Bottle was changed. 6:05 The beam energy drops to 3521 MeV. 6:15 While being corrected, the beam energy overshot 3523.3 MeV and landed at about 3523.65 MeV. Over the next half hour it was lowered back to 3523.3 MeV. Have a good morning, Jason & Ted