Shift Summary for 5/6/00 8:00-11:00 On Shift: JK,MN Log Book #8 Pages 51-53 Run Summary: 1P1 (3526.25 MeV) Beginning Current : 10.8 mA Final Current : 8.8 mA Typical Luminosity: 1.6x10^31 cm^-2 s^-1 Typical Beam Width: 1.2 MeV/c Run Luminosity 5781 274.5 nb^-1 Comments: Total Luminosity this stack is 0.95 pb^-1. Run 5781 was resumed at 8:24 (see previous shift summary). Jet Mac communication to MCR was reintialized twice. At 8:55 a bad QPA02 was discovered. MN and GC are looking into it. It was also noticed that the beam was drifting downwards to 3526.1 MeV. MCR was called and by 9:10 the energy was back to 3526.25 MeV. At 11:00 the beam was dumped and the end of stack script was run. See Keith's email for plans for the next stack. Have a good day, Jason and Matteo ns for the next stack. Have a good day, Jason and Matteo