On shift: GL, TV Logbook #8, pages 64-66 Ecm = 3526.25 MeV Typical SigmaP : ~1 MeV Typical luminosity: 1.8 x 10^31 cm^-2s^-1 Total integrated luminosity at this point (stack #26) : 2459.6 nb-1 Run 5789 331.2 nb-1 Run 5790 138.2 nb-1 End of stack script was run. Comments: Performed 4 nozzle unclogs and 1 DAQ RESET. At 18:10 we noticed that the Ecm drifted down to 3526.15; we called MCR and after 20 min Ecm went back up. At 22:00 we stopped run 5790 to allow S. Werkema, E. Harms, Keith, Gabriele and M. Hu to perform a test to check for possible losses of gas through the beam valve. At 11:00 the beam was dumped, then Wander, Gigi and Matteo accessed the pit to replace a preamp in the fibers' readout electronics. Have a good night, Giovanni and Ted ronics. Have a good night, Giovanni and Ted