Summary for 6/14/00 0:00-8:00 On Shift: AT,ZM (with present of Keith, Paolo and Wander) Log Book #8 Page 88-89 1:30 start of deceleration to psi' (stacking ended at 25mA) 3687.50 MeV data point skipped. 6:40 Martin Hu called, beam is ready ( Ecm=3686.5 MeV, sigmap ~0.8MeV/c, I=23.9 mA). Slowly turned on jet target up to 8*10^13 atom/cm^3 Wander and Paolo performed the trigger studies. run 5817 - nolog run 7:55 - run 5818 started ( Ecm = 3686.5 MeV, sigmap = 0.8 MeV/c ). The run for calculation of trigger/hodoscope efficiency. good morning, Amiran and Zaza.