On shift: WB, MN Logbook n.8, pag 95-99 run 5825 E=3686.00 Int.L.=55.5 nb^-1 (inherited) run 5826 E change Int.L.=18.5 nb^-1 run 5827 E=3685.75 Int.L.=78.8 nb^-1 run 5828 E=3685.75 Int.L.=68.4 nb^-1 run 5829 E change Int.L.=20.4 nb^-1 run 5830 E=3685.50 Int.L.=79.1 nb^-1 run 5831 E=3685.50 Int.L.=48.5 nb^-1 run 5832 pedestal not written to database Deceleration finished at 24:00. Comments: - between 16:09 and 16:15, about 25 events had some problems with VSN 5 (ADC CCAL R2,W1-16); - two DAQ hangs (17:07 and 18:40). DYC 5 have "DATA IN"; - at 19:40 the pbarp 90deg trigger bundle is changed from 11 to 12 (it was done at the end of run 5828. All the previous runs have the wrong bundle). Wander and Matteo dle). Wander and Matteo