Shift Summary for 6/15/00 0:00-5:30 On Shift: JK,PR Log Book #8 Pages 100-102 Run Summary: Psip Scan Final Point (3684.5 MeV) Beginning Current: 16.3 mA Final Current : 14.0 mA Typical Luminosity: 1.6x10^31 cm^-2 s^-1 Typical Beam Width: 0.7 MeV/c Run Luminosity (nb^-1) 5833 79.3 5834 78.3 5835-5836 no data 5837 78.6 Comments: 2 DAQ hangs. Runs 5835 was not used since we didn't mount the new set of tapes quickly enough and run 5836 was not used because of related problems. MCR was able to begin stacking at 5:15 and since we already had 236.2 nb^-1 at this point (approximately twice what we had the other points) we decided to have the beam dumped and begin stacking. Good Night/Morning, Jason & Paolo