On shift: WB, GC Not much to say... after 20 mA of beam were lost (see previous report) it was decided to go back to stacking until 5:00-6:00 am and then decelerate to the psi' point that was missed during the last scan (Ecm=3687.5 MeV). At 5:30 the stacking finished with 14.03 mA, at the end of the shift the deceleration/cooling was still in progress. Have a good day Gigi & Wander