Shift Summary for 6/18/00 0:00-8:00 On Shift: JK,SP +KEG for the first 1/3 Log Book #8 Pages 106-110 Deceleration to 3384.5 MeV ends at 1:25 with 44.0 mA. Run Summary 5843 pedestal run 5844 aborted (see below) 5845 187.2 nb^-1 5846 254.3 nb^-1 Typical Luminosity: 2.6x10^31 cm^-2 s^-1 Typical Beam Width: 1.7 MeV/c Comments: 1:00 Wander and Matteo come in to look into why the dewar is losing liquid so quickly (4 L/hr). They left at 3:45 with the situation stable. 1:53 An initially resettable, but recurring DAQ hang is tracked to a module in the VME crate. After a few resets we could no longer establish OCP control so run 5844 was aborted and the crate was power cycled. After a drt_fresh_start, everything was fine. 2:03 R10 W32 was found to be hot (from the online monitor). It is probably due to a narrow pedestal. 4:27 Run 5845 was stopped early to look into a problem with the Etot thresholds. They appear to be high since the psi' running. The hardware seems to be functioning properly. Analysis is continuing. Good Morning, Jason & Stephen rything was fine. 2:03 R10 W32 was found to be hot (from the online monitor). It is probably due to a narrow pedestal. 4:27 Run 5845 was stopped early to look into a problem with the Etot thresholds. They appear to be high since the psi' running. The hardware seems to be functioning properly. Analysis is continuing. Good Morning, Jason & Stephen