Shift Summary 6/19/2000 Day: Beam at start: 20.5 mA; Beam at end: 14.2 mA ; Typical Lumin. 2.5 x 10^31 Data type: chi0 background (Ecm = 3385 MeV) Runs 5858 (236.7 nb-1) (inherited) 5859 (242.1 nb-1) 5860 in progress Total luminosity up to run 5859 included: 2803.2 nb-1 Shifters: DB, PR, NP Log Book 8 Pages 119-121 Summary: We unclogged the jet target nozzle twice and reset the DAQ 5-6 times. Othen than that nothing special to report. Diego, Paolo and Nadia