Shift Summary for 6/23/00 8:00-16:00 On Shift: GG, 1/2 NP + 1/2 JK Log Book #8 Pages 123-126 Because of some stacking and cooling troubles over night, the first run did not begin until 10:35 with 35.6 mA remaining. The run was paused for about an hour a few minutes into it when it was noticed that the beam loss was very high (-2.75 mA/hr). After fixing a configuration problem with the vertical cooling the run was resumed. Run Luminosity 5872 269 nb^-1 5873 handed over to day shift Typical Luminosity: 2.6x10^31 cm^-2 s^-1 Typical Beam Width:1.2 MeV/c Current at end of shift: 31.0 mA Good Evening and Good Weekend, Jason & Gabriele