On Shift: SS, PR Logbook pages: 134-135 logbook#8 Beam current at beginning: 14.8 mA at end: 10.3 mA Data taking at Ecm = 3409 MeV, which is the second (and last) point of this stack. Run5881 Int_lum: 301.2 nb^-1 Run5882 (in progress) Shift description: At the beginning of the shift everything was ready to start the first run of this energy point. The jet target took ~40 min to reach the density we set (the actual pressure moved very slowly toward the set point). Very smooth shift. 2 DAQ hangs. Jet target unclogged 5 times. Good night, Seon-Hee and Paolo