On shift: GB,GC Logbook n. 8 pag. 181-184 Run Summary: 1p1 (3526.2 MeV) Beginning Current : ~20 mA Final Current : ~14 mA Typical Sigmap ~ 1.3 MeV/c at beginning ~0.95 MeV/c at end of shift Luminosity ~ 2.8x10^31 cm^-2 s^-1 Run 7003 319.6 nb^-1 (inherited) Run 7004 318.3 nb^-1 Run 7005 204 nb^-1 till now(in progress) Comments: 6 DAQ hangs cured with resetting 0:30 called G.Stancari since beam sigma_p was too large (1.3 MeV/c). Giulio called MCR who will try to improve 2:00 beam still large (sigma_p~1.2) MeV/c; talked to MCR: the cooling had just tripped off 3:00 freon 12 consumption looks high (1 lb/3 hours vs 2 lbs/day normally). No obvious leak detected. 5:00 beam has now sigma_p~ below 1 MeV/c 7:00 unclogged nozzle Bye Gianluigi and Giovanni